NESHAP compliance

Pre-Demolition & Renovation Asbestos Surveys

Required before commercial demolition or renovation. A NESHAP-compliant survey tells your crew exactly what is there and what has to come out first, so the project starts on time.

  • Licensed & Insured
  • Accredited Lab Analysis
  • Residential & Commercial

Why the survey comes before the permit

Demolition and renovation projects run on a schedule, and the asbestos survey is the item most likely to stall one. If the survey is late, the abatement is late, and the crew, the dumpsters, the equipment rental and the permit are all sitting on the clock. Doing the survey early is not paperwork for its own sake; it is what lets the rest of the project be priced and scheduled realistically.

Federal rules under the EPA’s National Emission Standards for Hazardous Air Pollutants require an inspection of a facility before demolition or renovation, and require that asbestos-containing material be removed before the structure is disturbed. Ohio regulates that removal through the Ohio Department of Health. A survey that is thorough and properly documented is what both of those processes are built on.

Demolition survey versus renovation survey

A demolition survey is comprehensive and intrusive. The building is coming down, so the survey must find material that is normally hidden: inside wall cavities, above ceilings, behind mechanical equipment, underlayment beneath finished floors, insulation in concealed chases. Anything left unrecognized goes into the debris stream as regulated waste.

A renovation survey is scoped to the areas the work will touch, but within those areas it still has to anticipate what will be opened up. A survey limited to visible finishes on a floor that is about to be gutted leaves the concealed material unaccounted for. We scope renovation surveys from the actual work plan, not from a generic checklist.

How the survey is performed

We begin with available drawings and a walkthrough, then work systematically through the building by area and material type. Each distinct material is sampled and logged, and each sample is documented with a location and a photograph. Sampling uses wet methods and containment, and every sample is sealed and tracked on a chain-of-custody form to the accredited laboratory.

Analysis is by polarized light microscopy as standard, with transmission electron microscopy when a material is layered, contaminated or otherwise difficult to call. Large projects are often surveyed in phases so the early areas can go out for abatement bidding while later areas are still being walked.

What your project team gets

  • A material inventory listing every suspected and confirmed material, by building area
  • Quantities in linear feet, square feet or cubic feet for accurate abatement pricing
  • Condition assessment, so friable and non-friable material are treated correctly
  • Photographs of each material in place
  • The original accredited laboratory reports for every sample
  • Recommendations that separate material requiring removal from material that can be handled in place

That package is what an abatement contractor prices from, what a consultant uses to prepare the abatement specification, and what you keep in the project file if a regulator or a lender asks how the waste stream was characterized.

Working with the demolition contractor

We are used to operating inside a construction schedule. That means coordinating site access with the demolition contractor, working around structural or utility work that has to happen first, and delivering the report in time for abatement to be sequenced before demolition begins. When a project has a hard start date, tell us at the first call and we will work backwards from it.

Where the project also needs clearance air testing after abatement, we schedule that as part of the same sequence so the space is signed off and released to the demolition crew without a gap.

Older Cleveland commercial buildings

Cleveland’s commercial stock includes a lot of early twentieth century brick warehouses, mid-century industrial buildings and former schools and churches now being converted or cleared. Those buildings tend to carry spray-applied fireproofing, boiler and pipe insulation, and multiple generations of flooring stacked on top of each other. They also tend to have drawings that no longer match the building. We plan for that: survey time is based on the building we find, not the building on paper.

Frequently Asked Questions

Next step

Schedule Your Asbestos Test Today

Tell us the property address and what you are planning. We will confirm a sampling time and explain exactly what gets tested.

Call (216) 208-4092Mon–Fri 8:00 AM – 6:00 PM · Sat by appointment