Who needs a commercial asbestos survey
A commercial survey answers one question: what asbestos is in this building, where is it, and how much of it is there. That question comes up in a handful of predictable situations, and each one has a different deadline attached to it.
- Property managers and building owners planning a tenant improvement, a mechanical upgrade or a roof replacement, where the work will disturb existing finishes
- Buyers and lenders doing due diligence on an office, warehouse, mixed-use or multi-family property
- General contractors pricing a renovation who need quantities before they bid
- Facility directors who need an inventory of known asbestos-containing material for an operations and maintenance plan
- Landlords and portfolio owners responding to a tenant concern or a city inspection
What a survey covers
We inventory every accessible material in the building that could contain asbestos, not just the obvious ones. That includes floor tile and mastic, ceiling tile and grid, spray-applied fireproofing, pipe and duct insulation, boiler and mechanical room insulation, fire doors, gaskets, roofing materials, exterior panels, window caulking and joint compound.
Quantities matter as much as presence. A report that says “pipe insulation contains asbestos” is not useful to a contractor who needs to know whether there are 40 linear feet or 400. We measure what we find in linear feet, square feet or cubic feet, and we photograph it in place so the next person to open the report recognizes what they are looking at.
Levels of survey
Not every project needs the same depth. A limited survey covers only the materials a specific scope of work will disturb. A functional survey covers an entire building system or area, such as all mechanical spaces. A comprehensive survey inventories the whole building and is the right choice before a major renovation, a change of use or a sale.
We recommend the level based on what you are actually doing. Paying for a full building inventory when you are only replacing one rooftop unit is a waste; surveying one mechanical room when the whole floor plate is being gutted leaves you exposed.
Ohio and EPA requirements
Asbestos abatement in Ohio is regulated by the Ohio Department of Health, which licenses contractors, requires notification before certain projects and sets work practice standards. Federally, the EPA’s National Emission Standards for Hazardous Air Pollutants (NESHAP) requires an inspection before renovation or demolition of most commercial and institutional buildings, and requires that the survey identify and quantify asbestos-containing material before work begins.
Our reports are written to support that process: identified materials, quantities, condition, laboratory data and recommendations. If your project also needs a pre-demolition survey, the scope can be combined into a single site visit.
What you receive
You get a bound PDF report plus the original accredited laboratory results. The report includes a material inventory table, a floor-by-floor location summary, photographs of each material in place, the laboratory analysis for every sample and a recommendations section written for the scope of work you described.
For buildings where asbestos will be managed rather than removed, we add the condition assessment and material locations an operations and maintenance plan needs. For buildings heading into abatement, we can identify the abatement quantities your contractor will price against.
Scheduling around occupied buildings
Most of our commercial work happens in buildings that are in use. We schedule around tenant hours, work in mechanical rooms and vacant suites during the day and occupied areas after hours, and keep sampling contained so no dust travels through the building. For multi-building portfolios, we survey in phases and deliver reports as each building is finished rather than holding everything to the end.
